Wind Farm Foundations |



|
Wind Farm Foundations |
|
W.I. Construction has extensive experience in the wind farm industry, where work is very fast paced and design mixes must meet stringent requirements. The crew is able to mobilize equipment and be ready to supply ready mix concrete in 3-5 days, depending on location. |
|
Willow Creek Wind Farm, Ione, Oregon—2008 Concrete & Road Rock Developer: Invenergy Contractor: DH Blattner
Pebble Springs Wind Farm, Arlington, Oregon—2008 Developer: PPM Energy Contractor: DH Blattner
Goodnoe Hills Wind Farm, Goldendale, Washington—2007 Concrete for Foundations Developer: enXco/Windtricity Contractor: MA Mortensen Achieved highest one-day output ever, producing 1150 cubic yards in 9 hours and 35minutes, with a two hour delay between bases (pours), from one plant.
Leaning Juniper I, Arlington, Oregon—2006 Concrete for Foundations & Road Rock Developer: PPM Energy Contractor: DH Blattner W.I.’s resume includes both public and private works projects. Our primary objective is to supply ready-mix concrete to the local wind energy projects located in north-central Oregon and south-central Washington. W.I., Inc. looks forward to an opportunity to bid on your upcoming projects and a chance to serve you in the near future. |







|
Home of the Redi-Wall® |
|
W.I., Inc. ► 18122 Hulden Road, Arlington, Oregon 97812 ► 542-454-2244 ► Fax: 542-454-2344 Email: info@wi-concrete.com
Webmaster: Wing Rider Design |